The Short Version
California's Building Energy Efficiency Standards, Title 24 Part 6, apply to additions and alterations as well as new construction, scaled to the scope of work. The 2025 edition applies to projects permitted on or after January 1, 2026, and it moves the prescriptive baseline toward heat pumps for space and water heating. Large glazing areas usually push a project off the prescriptive checklist onto the performance path, where trade-offs are modeled. Several measures require independent field verification, which has to be scheduled rather than assumed.
In This Article
When a Project Triggers Compliance
Title 24 Part 6 is not limited to ground-up construction. Additions, alterations and repairs are all within its reach, with requirements scaled to what you are actually doing. Replacing a dishwasher does not engage it. Replacing the HVAC system, adding conditioned floor area, replacing windows or opening walls and rewiring lighting generally does, and each of those triggers a different set of forms.
The edition that governs is determined by the permit application date, not by when you signed the construction contract. The 2025 standards apply to projects that apply for a permit on or after January 1, 2026. On a project that has been in design for two years, that distinction can change the mechanical scope late, which is a good reason to confirm the applicable edition with your architect before the drawings are final.
Additions are treated as their own category. A new conditioned wing is evaluated against addition requirements rather than full new-construction requirements, which is why the solar photovoltaic mandate that applies to newly constructed single-family dwellings does not automatically attach to every addition. The boundary between a large addition and what amounts to a new house is a judgment your plan checker will make, and it is worth asking early.
Alterations carry their own traps. Replacing a furnace often brings duct sealing, load calculations and field verification into a project the owner thought was a same-day equipment swap. Our HVAC inspection piece describes what to look for in an existing system before you plan around it.
Prescriptive Versus Performance
There are two ways to comply. The prescriptive path is a checklist: every component has to meet or beat a value from a table — window U-factor and solar heat gain coefficient, insulation levels, equipment efficiency, duct sealing. It is fast, it is cheap to document, and it is inflexible. If one element misses, the package fails.
The performance path models the whole building in approved compliance software and compares it to a standard design of the same geometry. Underperformance in one area can be offset by outperformance in another. This is the path most designed houses use, because it is the only way to specify large glazed openings without meeting every prescriptive fenestration value individually.
The trade-offs are real, not cosmetic. Buying back a wall of west-facing glass generally costs you somewhere else: higher-performance glazing, a more efficient mechanical system, a tighter envelope, more insulation, sometimes photovoltaics. The energy consultant should be modeling early enough that those choices are still design decisions rather than value-engineering under deadline.
One structural change in the current code matters more than the rest: heat pumps have moved to the prescriptive baseline for both space heating and water heating. A project that intends to keep gas equipment is not necessarily prohibited, but it is usually pushed onto the performance path and has to buy that decision back with efficiency elsewhere. Budget for the electrical service capacity that an all-electric mechanical package implies.
Glass, Mechanical and the Rest of the Package
Glazing is the first constraint most clients feel. Title 24 does not cap window area outright, but each square foot of glass carries a thermal and solar penalty the model has to absorb. West and south exposures cost the most. The usual answers are high-performance coatings, thermally broken frames, exterior shading that is architectural rather than applied, and orientation decisions made at the massing stage rather than defended later.
Mechanical compliance extends past the equipment. Duct location and leakage, refrigerant charge, air handler airflow and fan efficacy all carry requirements, and several are verified in the field rather than accepted on paper. Ducts in conditioned space perform better in the model and usually cost more in the plan, which is a trade worth making early when there is still ceiling depth to give.
Water heating has become a project in itself. A heat pump water heater needs space, air volume, a condensate path and an electrical circuit, none of which fit gracefully into the closet that held a gas unit. On a remodel this frequently means relocating the water heating plant, which in turn means re-running lines through finished construction.
Photovoltaics and storage interact with all of it. Where a project is required or elected to add solar, the current export compensation structure changes the economics relative to older installations, which is why pairing panels with battery storage has become the common approach. See the current solar tariff discussion for how that math has shifted.
Documentation and Field Verification
Compliance produces paper at three stages. The certificate of compliance goes in with the permit set and is signed by the person responsible for the design. The certificate of installation is signed by the installing contractor as work is completed. The certificate of verification is signed by an independent third-party field verifier after testing. All three have to be registered with an approved data registry, and the inspector will look for them.
Field verification is the part that affects the schedule. Duct leakage testing, refrigerant charge verification, airflow and fan efficacy, envelope quality insulation installation and several other measures require a rater on site at specific construction stages — some before drywall, some at completion. Miss the window and the wall has to be reopened.
Book the verifier when you book the mechanical subcontractor, not when the inspector asks. Rater availability is a real constraint on the timeline, and a failed test means a correction and a reinspection, not a note in the file. Plan the sequence the way you would plan any other trade with a dependency.
Budget for the soft cost as a line item. The energy consultant, the compliance modeling, the registry fees and the field verification are a modest share of a large renovation but a visible share of a small one, and they are frequently omitted from early estimates. Permit strategy on a luxury renovation covers how to phase the work sensibly.
Older and Architecturally Significant Houses
The tension is genuine. A mid-century house whose character is single glazing in slender steel frames, exposed ceilings with no insulation cavity and a radiant slab does not want to become a high-performance envelope. Meeting current standards while preserving what makes the house worth preserving takes deliberate strategy rather than a default specification.
Several approaches usually help. Keep the scope of alteration tightly defined, so that untouched assemblies are not pulled into compliance. Use the performance path and put the efficiency gains where they are invisible — roof insulation, mechanical equipment, air sealing — so the visible assemblies can stay closer to original. Where a historic designation applies, ask the plan checker about the provisions available to qualified historic buildings rather than assuming none exist.
Designation itself changes the calculus. A designated property may have access to review paths and, separately, to property tax relief that can help fund the work. The Mills Act discussion and our notes on mid-century preservation are the places to start.
For a buyer underwriting a renovation, the practical instruction is to get the energy consultant into the conversation during the contingency period. What the code will demand of a particular house is knowable before you own it, and it belongs in the renovation budget rather than in a change order. More of our analysis sits under market intelligence.
Frequently Asked Questions
Does a kitchen remodel trigger Title 24 compliance?
It depends on scope. Cosmetic replacement of cabinets and finishes generally does not engage the energy standards, but replacing windows, altering mechanical systems, adding conditioned area or substantially rewiring lighting typically does. The requirements are scaled to the work, so a modest alteration produces modest documentation. Ask your architect which forms the project will generate before you finalize the drawings.
Do I have to install a heat pump in my remodel?
Heat pumps are the prescriptive baseline for space and water heating under the current standards, which is different from a prohibition on other equipment. A project can generally retain other systems by complying through the performance path and offsetting the shortfall with efficiency elsewhere. That trade has a cost, and so does the electrical capacity an all-electric package requires, so model it early.
What is HERS or field verification, and why does it affect my schedule?
Certain measures, including duct leakage and refrigerant charge, must be tested by an independent third-party field verifier rather than accepted on the contractor's word. Some tests happen before drywall and some at completion. Because the verifier is a separate scheduled trade with limited availability, a missed test window can mean reopening finished work. Book the verifier alongside the mechanical contractor.
Which edition of the energy code applies to my project?
Generally the edition in effect when the permit application is submitted, not when design began or when construction starts. The 2025 standards apply to projects applying for a permit on or after January 1, 2026. Projects that have been in design for a long time should confirm the applicable edition with the building department, because a change of edition can alter the mechanical scope late in the process.
Energy compliance belongs in the renovation budget, not the change orders
We bring the energy consultant into diligence so a buyer knows what the code will ask of a particular house before the contingency period closes. It is the difference between a modeled design decision and a late compromise. To review a property or a planned scope, request a strategy call.
Schedule a Strategy CallPatricia Blakemore · Elite Collective
Direct: (213) 319-3040
Toll Free: (844) 475-0999
Email: [email protected]
Address: Manhattan Beach, California 90266
Web: www.elitecollectiverealty.com
CalDRE# 02079554 · Patricia Blakemore, Broker/Owner · Elite Collective
Authoritative Sources
- California Energy Commission — Building Energy Efficiency Standards (Title 24, Part 6)
- California Energy Commission — 2025 Energy Code, effective January 1, 2026
- California Building Standards Commission
Reviewed by Patricia Blakemore, Broker/Owner, Elite Collective · CalDRE# 02079554 · (844) 475-0999 · [email protected]