The Short Version
New construction in Los Angeles luxury carries a different diligence profile from a resale. The punch list walkthrough is where cosmetic and functional deficiencies are documented, assigned and scheduled for correction before closing. Buyers should bring an independent inspector, test every system, photograph and number each item, and tie completion to the purchase contract where possible. California's Right to Repair Act, often called SB 800, also sets building standards and a claims process for new homes sold since 2003.
In This Article
Why New Construction Needs Its Own Walkthrough
Buyers often assume a new home needs less scrutiny than an older one. In our experience the opposite is closer to the truth. A resale home has lived through seasons, rainstorms and daily use, and its weaknesses tend to be visible. A new home has not been tested. Drainage has not handled a storm, the HVAC has not run through a summer, and dozens of trades have worked in sequence, sometimes on a compressed schedule as the builder approaches sale.
A city or county building department's final inspection confirms code compliance for the items it inspects. It does not confirm that the finishes match the specification, that the cabinet doors align, that the audiovisual system works or that the stone was sealed. The punch list walkthrough fills that gap. It is distinct from, and earlier than, the final walkthrough before closing, which confirms that agreed items were completed and the property is in the expected condition.
Timing the Walkthrough
The ideal sequence has two or three visits, not one:
- Pre-drywall review where the purchase is made during construction. An inspector can see framing, plumbing, electrical and waterproofing details that will soon be concealed.
- Punch list walkthrough once the builder declares the home substantially complete, typically after the final building inspection and before closing, with enough time for corrections.
- Verification walkthrough shortly before closing to confirm each item was addressed.
Allow time between the punch list and closing. Two to three weeks is a common target for a luxury home, though the right window depends on the length of the list and the availability of specialty trades such as stone fabricators, glass installers and integrators. If the builder proposes a single walkthrough the day before closing, we treat that as a negotiating point rather than a formality.
Who Should Be in the Room
The buyer's agent and the builder's representative attend by default. For a property at this level we recommend adding an independent home inspector with new-construction experience, who works for the buyer rather than the builder. Our guide to home inspections for luxury properties describes how to choose one.
Depending on the home, specialists can be worth the fee:
- An infrared thermal scan to identify missing insulation, moisture intrusion and electrical hot spots. We explain the method in infrared thermal imaging inspections.
- A roofing or waterproofing consultant for flat roofs, roof decks and below-grade spaces.
- A low-voltage integrator to verify networking, lighting control, security and audiovisual systems.
- A pool and spa specialist where those systems are present.
The designer or architect, if the buyer has a relationship with them, can confirm finish selections against the specification.
What to Test and Document
Work room by room, top to bottom, with the specification sheet in hand. Test every system rather than observing it:
- Water: run every fixture hot and cold, fill tubs, check drain speed, and look beneath sinks for leaks after use.
- Openings: operate every window, door, lift-slide and pocket door; check locks, seals and screens.
- Climate: run heating and cooling in each zone and confirm thermostats control the correct areas.
- Electrical: test outlets, GFCI protection, lighting scenes, dimmers and exterior lighting.
- Finishes: inspect stone for chips and sealing, paint for coverage, millwork for alignment and floors for gaps or damage.
- Exterior: examine grading and drainage away from the foundation, hardscape, irrigation coverage and gate operation.
Number each item, photograph it with a reference marker, note the location and describe the expected correction. Use painter's tape sparingly and confirm with the builder first, since some tapes can damage finishes. Send the list in writing and ask the builder to acknowledge it in writing.
Contract Leverage: Completion, Escrow Holdbacks and Credits
The punch list carries weight only if the contract supports it. Builder contracts are often drafted in the builder's favor, so review the completion and walkthrough provisions before signing. Points worth negotiating include:
- A defined right to a walkthrough with a stated window before closing.
- A requirement that listed items be completed before closing, or a mechanism to address those that cannot be.
- An escrow holdback, where an agreed amount is held from the seller's proceeds until specified items are completed, if the lender, escrow holder and builder all agree to it.
- A credit for items the buyer prefers to complete independently.
Holdbacks and credits each have consequences for financing and appraisal, so coordinate with the lender early. Items that are seasonal, such as landscaping or an exterior finish that requires dry weather, are the most common candidates for post-closing completion and should carry a written deadline.
Builder Obligations Under California's Right to Repair Act
For new residential units sold under a purchase agreement signed on or after January 1, 2003, California's Right to Repair Act, enacted through SB 800 and codified beginning at Civil Code Section 895, sets functional building standards and a prelitigation claims process. Summaries of the law describe a general limit of ten years after substantial completion for claims, with shorter periods for specific components, for example one year for noise transmission and irrigation claims, two years for wood posts, four years for steel fences and five years for paint.
The act also contemplates a builder warranty covering fit and finish items such as cabinets, mirrors, flooring, walls, countertops, paint finishes and trim, generally for at least one year. The claims process requires written notice to the builder, followed by timelines for acknowledgment, inspection and an offer to repair. Builders must also provide maintenance recommendations, and a homeowner's failure to follow reasonable recommendations can be raised as a defense. Keep those documents, along with the closed punch list, in the home's records.
After Closing: Handover and the First Year
A disciplined handover protects the warranty position and the home's future resale. Request the complete package: permits and final inspection records, warranties for appliances, roofing, windows and equipment, as-built drawings, finish schedules with product names and colors, and maintenance manuals. Smart home credentials and system documentation deserve their own checklist.
Calendar a review before the builder's fit and finish warranty period ends. Many issues appear only after the first rainy season or the first summer, including drywall cracks from settlement, grout or caulk separation, and irrigation adjustments. Report them in writing, promptly, and keep copies of every communication.
Our buyer advisory includes new-construction contract review and walkthrough coordination, so the leverage is preserved from the purchase agreement through the first anniversary of ownership.
Frequently Asked Questions
What is a punch list on new construction?
A punch list is a written, itemized record of deficiencies, incomplete work and finish defects identified as a new home nears completion. Each item is assigned to the builder for correction, ideally before closing. It covers matters a building department's final inspection does not address, such as finish quality, alignment and system performance.
When should the punch list walkthrough happen?
Ideally once the builder declares the home substantially complete and after final building inspection, with enough time before closing for corrections. For a luxury home, two to three weeks is a common target. A verification walkthrough shortly before closing then confirms each item was completed. Contract terms control the timing.
Should I hire my own inspector for a new home?
Yes. An independent inspector with new-construction experience works for you, not the builder, and can identify issues in roofing, drainage, mechanical systems and finishes that are easy to miss. Consider specialists for thermal imaging, waterproofing, low-voltage systems and pools where the home includes them.
What happens if items are not finished by closing?
Options include delaying closing, negotiating a credit or arranging an escrow holdback in which funds are held until specified work is completed. Holdbacks require agreement from the builder, escrow holder and lender. Any post-closing completion should be documented in writing with a defined scope and deadline.
What protection does SB 800 give buyers of new homes?
California's Right to Repair Act sets building standards for new homes sold under contracts signed since January 1, 2003, with a general ten-year claims limit and shorter periods for specific components. It establishes a written notice and repair process before litigation. An attorney can explain how it applies to a specific situation.
Buying new construction in Los Angeles?
We can review the builder contract, coordinate inspectors and manage the punch list process from the first walkthrough through closing. Schedule a strategy call, or visit Buyers and Sellers.
Schedule a Strategy CallPatricia Blakemore · Elite Collective
Direct: (213) 319-3040
Toll Free: (844) 475-0999
Email: [email protected]
Address: Manhattan Beach, California 90266
Web: www.elitecollectiverealty.com
CalDRE# 02079554 · Patricia Blakemore, Broker/Owner · Elite Collective Realty