Elite Collective Realty
Due Diligence & Transactions · November 2026

The Baseline Hillside Ordinance: How Slope Sets Buildable Square Footage in Los Angeles

On a hillside lot in Los Angeles, the size of the parcel says little about how much house it can hold. The slope underneath it says a great deal more.

By Patricia Blakemore, Broker/Owner · Elite Collective · November 16, 2026

The Short Version

The Baseline Hillside Ordinance governs single-family lots in the City of Los Angeles's designated Hillside Area. It sets maximum residential floor area by applying a floor-area ratio to each slope band of the lot, so the steepest ground contributes little or nothing. The ordinance also limits grading, controls height through an envelope that follows the terrain, and adds rules for substandard streets. It is separate from the Baseline Mansionization Ordinance, which covers flatter lots. For buyers, it drives teardown and expansion value.

In This Article

  1. What the BHO is and where it applies
  2. How slope bands set maximum floor area
  3. What counts as floor area
  4. Grading limits and hauling
  5. Height envelopes and street conditions
  6. BHO versus BMO
  7. How the BHO shapes teardown and expansion value

What the BHO is and where it applies

The Baseline Hillside Ordinance, or BHO, is part of the Los Angeles Municipal Code at Section 12.21 C.10. It applies to lots zoned RA, RE, RS and R1, including the R1 variation zones, that fall within the City's designated Hillside Area. It was adopted in 2011 and amended in 2017 as part of the same effort that revised the rules for flatter neighborhoods.

Whether a lot is in the Hillside Area is a mapped designation, not a judgment based on how steep the street looks. City Planning materials direct owners to confirm it through ZIMAS, the City's zoning information system, which lists the hillside designation and any overlays for each parcel. Some hillside neighborhoods also have specific plans or a Hillside Construction Regulation district, and those rules apply in addition to the BHO.

The BHO does not apply to parcels in unincorporated Los Angeles County or in separate cities such as Beverly Hills, which have their own hillside rules.

How slope bands set maximum floor area

The BHO calculates maximum residential floor area, or RFA, from a slope analysis rather than a single ratio for the whole lot. A licensed surveyor or engineer maps the lot's contours and divides the area into slope bands. Each band's area is multiplied by the floor-area ratio for that band in the lot's zone, and the results are added together.

City Planning's current hillside worksheet sets these R1 factors:

Larger-lot zones use lower factors. For RE40, the factors run from 0.35 on the flattest band to 0.15 on slopes of 60 to 99.99 percent. For RA, they run from 0.25 to 0.05. The R1 variation zones, R1H1 through R1H4, have their own table. Ground at 100 percent slope or steeper adds nothing in any zone.

The code also includes a guaranteed minimum floor area for very steep lots. Confirm the current figure for the zone with City Planning before relying on it.

What counts as floor area

Residential floor area is defined in LAMC Section 12.03, and the details matter as much as the ratio. In general, it counts enclosed area within the exterior walls. Certain spaces are counted differently or excluded:

The 2017 amendments changed several of these rules, so older plan sets and broker summaries may be outdated. An architect should check the current definition for any project. The same definitional issues affect flat lots, as our guide to the Baseline Mansionization Ordinance explains.

Grading limits and hauling

The BHO caps how much earth can be moved without discretionary approval. City guidance describes a base allowance of 500 cubic yards plus a quantity equal to 5 percent of lot area, subject to a maximum for each zone. Published summaries list those maximums at 1,000 cubic yards for R1 and 3,300 cubic yards for RE40. Some categories, such as certain foundation, driveway or geotechnically required remedial grading, have historically been treated differently. Import and export are also limited. Larger quantities generally require a Zoning Administrator determination, and the code requires landform grading techniques for larger approvals.

In neighborhoods with a Hillside Construction Regulation district, which City Planning lists as including Bel Air, Beverly Crest, Laurel Canyon, Kirkwood and the Bird Streets, there are further limits on haul trips, construction hours and very large homes. Our guide to grading permits and soil haul covers the permitting side, and our geotechnical due diligence guide explains how soils reports affect what can be built.

Height envelopes and street conditions

Hillside height is measured differently from height on flat lots. Instead of a single plane above the lowest point of the site, the BHO uses an envelope that follows the grade under the building, so a house can step down a slope while staying within the limit at each point. Permitted height depends on the zone, the height district and roof form, with sloped roofs generally allowed more height than flat ones. The 2017 amendments also brought encroachment-plane concepts to R1 hillside lots.

The street the lot fronts on matters too. Lots on what the code calls a Substandard Hillside Limited Street, generally a narrow or substandard hillside roadway, face additional requirements. These can include extra on-site parking for larger homes and lower height near the front lot line. Fire access and road width also come up in Fire Department review, which can affect plans for very large homes.

BHO versus BMO

The two ordinances are often confused because they were amended together and share a definition of residential floor area. In practice they divide the city's single-family land between them:

A lot falls under one or the other based on its mapped designation. Which one applies decides the method used to calculate what can be built, so confirm it before drawing any conclusions.

How the BHO shapes teardown and expansion value

For an investor or end user who plans to build, the BHO often matters more to value than the existing house. Two lots of the same size can support very different homes. A flatter pad with gentle surrounding slopes keeps most of its floor-area potential, while a lot that is largely steep ground may support much less. That is why we value hillside land on maximum buildable RFA, grading feasibility and access, not on lot size alone.

Before you price a teardown or major addition, we advise:

An existing house that is larger than current rules allow may be a legal nonconforming structure. In that case, keeping it may be worth more than replacing it. Our market intelligence work includes buildable-area analysis for hillside acquisitions.

This article is general information about the City of Los Angeles Baseline Hillside Ordinance as of 2026 and is not legal, land-use, engineering or financial advice. Floor area factors, grading limits, height rules and definitions are set by the Los Angeles Municipal Code and may be amended or interpreted differently for a specific parcel. Confirm current requirements with Los Angeles City Planning and LADBS, and consult a qualified architect, engineer or land-use attorney before acting.

Frequently Asked Questions

How do I know if my lot is subject to the Baseline Hillside Ordinance?

The hillside designation is a mapped City of Los Angeles designation, not a judgment based on how steep a street looks. Check the parcel in ZIMAS, the City's zoning information system, which shows the hillside designation and any overlays. The BHO applies to RA, RE, RS and R1 single-family zones within that designated Hillside Area.

Does steep ground count toward buildable square footage?

Only partly. Each slope band contributes its area multiplied by a floor-area factor that falls as the slope increases. Under City Planning's current worksheet, ground at 100 percent slope or steeper contributes nothing in any zone. A lot that is mostly steep can therefore support much less floor area than its total size suggests.

What is the difference between the BHO and the BMO?

Both limit the size of single-family homes in the City of Los Angeles. The BMO applies outside the Hillside Area and bases floor area on lot size and zone. The BHO applies inside the Hillside Area and bases floor area on slope bands, with added grading limits, a terrain-following height envelope and street-condition rules.

Can I grade more than the BHO allows?

Sometimes. Grading above the by-right amount generally requires a discretionary approval, such as a Zoning Administrator determination, and some remedial grading recommended in an approved geotechnical report has historically been treated differently. Neighborhoods with a Hillside Construction Regulation district have further limits. An engineer should confirm what applies to the parcel.

Should I rely on a listing's claim about buildable square footage?

No. Treat any figure in marketing as a starting point. Buildable area depends on a surveyed slope analysis, the current residential floor area definition, height and grading limits, and any overlays. An architect working from a topographic survey is the right source, and that work should be done before you remove contingencies.

Underwriting a hillside teardown or addition?

We can help you sequence the survey, slope analysis and architectural review so that price reflects what the lot can legally support. Schedule a strategy call, or visit Buyers and Sellers.

Schedule a Strategy Call

Sources: Los Angeles City Planning: Citywide Hillside Area Regulations Worksheet (LAMC 12.21 C.10) · Los Angeles City Planning: Baseline Hillside Ordinance Grading Handout · Los Angeles City Planning: Hillside Construction Regulation Fact Sheet and FAQs

Patricia Blakemore · Elite Collective

Direct: (213) 319-3040

Toll Free: (844) 475-0999

Email: [email protected]

Address: Manhattan Beach, California 90266

Web: www.elitecollectiverealty.com

CalDRE# 02079554 · Patricia Blakemore, Broker/Owner · Elite Collective Realty